Panels cut to the body-measurement spec, then graded across the size run — never a stock blank scaled up.
A cut and sew manufacturer is the factory that turns a tech pack into a wearable garment — not a print shop running blanks. We cut the pattern, state the fabric, set the seam and stitch density, attach the trim, and inspect to AQL 2.5 / 4.0 before anything ships. Send a sketch, a reference garment, or a finished tech pack to start.
What a Tech Pack Actually Controls
In cut and sew manufacturing a tech pack pins down a garment with numbers — seam allowance, stitch density, shrink tolerance. These four plates are what we build to, and what a reorder reproduces.
Panels cut to the body-measurement spec, then graded across the size run — never a stock blank scaled up.
Fabric lots pre-tested to ISO 5077 for shrink before a marker is laid. Weight, hand and drape matched to the product spec.
Seams specified in the tech pack — flatlock, single-needle 301 lockstitch or overlock — so stretch and finish are predictable.
Stitches per inch held to spec, then needle-detected to 1.2 mm so no broken needle survives inside a finished garment.
Cut and Sew Services
Basic patterns, on-demand tailoring, women’s fits and prototyping — with the pain point solved and a number to prove it. One low-MOQ factory, start to scale.
Stocking 500+ blanks to test one design ties up cash. Start at a 100-unit MOQ and scale from there.
Cut and sew rather than decorate blanks, so the pattern is owned — unit cost falls at volume breaks.
A stock size never fits the product spec. Garments are cut to measurements — sample in 5–7 days, bulk in 15–25.
Custom t-shirts, blankets, swimsuits, gym tracks, activewear. Send a design and a sample comes back for sign-off.
Garments that lose their shape after one wash are a silent brand killer. Cut and sew to a graded spec that holds across the size range.
Fit, drape and construction engineered through the run — so the line holds true, first sample through full volume.
A rough sketch usually becomes a rework loop. A prototyping facility turns it into a sample approved before any bulk spend.
Backed by years in fashion garment design, the first prototype lands close to the vision — not a revision away.
Put It Into Production
Share a sketch, a reference garment or a finished tech pack — get pattern feedback, per-unit cost and a production timeline back within one business day.
Cut and Sew Manufacturing Process
Six controlled stages, signed off before the next begins — so a cut and sew run stays true to the spec, pattern through final box.
A pattern tailored to the brand’s measurements, graded across all sizes — so lines come back the same.
Fabric, trims and accessories agreed up front, flaws caught before bulk — with a tech pack signed off at approval.
Operators sort by size, colour and quantity, then sew to the approved pattern — precise, fast, low-error.
A sample to approve before bulk — refinements happen first, so the transition to volume stays smooth.
Checked 3–4 times before shipment against a written standard — low defects, consistent quality.
Folded, tagged and boxed to spec — protected in transit, shelf-ready on arrival.
Send a design brief or tech pack — get fabric options, certifications, per-unit cost and a production timeline back within one business day.
Start typing to find articles
No articles found
Try a different keyword